DYI project for basement. I'd like to meet 2012 IPC code for this (town uses this). I've done many plumbing and electrical projects for 30 years. Some past work has been permitted when it was part of a larger permitted project.
Would anyone please comment on the following plan? The horizontal 4" waste is below slab. The lav is 12' total left and around a corner coming forward from the 3" vertical. The 1.5" horizontal vent will be in the ceiling joists. There will be a 4" check-valve downstream in an unfinished room as required by the town. Hopefully there's enough detail.
Thank you in advance,
Bill
DYI project for basement. I'd like to meet 2012 IPC code for this (town uses this). I've done many plumbing and electrical projects for 30 years. Some past work has been permitted when it was part of a larger permitted project.
Would anyone please comment on the following plan? The horizontal 4" waste is below slab. The lav is 12' total left and around a corner coming forward from the 3" vertical. The 1.5" horizontal vent will be in the ceiling joists. There will be a 4" check-valve downstream in an unfinished room as required by the town. Hopefully there's enough detail.
Thank you in advance,
Bill