Alexander Dobert
Member
I have an old cast iron clean out that I would like to replace. It serves one bathroom and vanity. I was wondering if I will need to support the upper portion of the remaining pipe both during and after replacement. Is the PVC section going, along with the new PVC clean-out, going to be strong enough to support the weight of the cast iron pipe above? Is there a possibility of things shifting after replacement? I would say that there is about 5 feet of cast iron pipe that will be remains, the majority after a 90 degree elbow about two fee t above the clean-out. We are talking 4" pipes. Thank you very much for any and all advice.