So I'm a woodworker but also stray into many other areas when I have to. I'm going to be installing a deep well convertible jet pump into my shop which has a 70 foot well. After looking at various diagrams I'm a bit confused on how I should set this up.
In this picture the ejector is installed directly on the pump.
But this diagram shows the ejector down at the bottom of the well with a send and return line.
So which is it? Is there a specific situation for each setup?
In this picture the ejector is installed directly on the pump.
But this diagram shows the ejector down at the bottom of the well with a send and return line.
So which is it? Is there a specific situation for each setup?