Hello,
I was wondering what's the easiest (legal) way to tie my future basement sink to the ejector pit? I attached a screenshot and a PDF as well.
I currently have a floor drain with a vent just downstream shown in blue (I'm assuming because the line is over 15ft long). Can I tie into the drain line downstream of the floor drain and the vent with the red line? Do I need another vent? The sink will have its own vent as well.
I was wondering what's the easiest (legal) way to tie my future basement sink to the ejector pit? I attached a screenshot and a PDF as well.
I currently have a floor drain with a vent just downstream shown in blue (I'm assuming because the line is over 15ft long). Can I tie into the drain line downstream of the floor drain and the vent with the red line? Do I need another vent? The sink will have its own vent as well.
Attachments
Last edited: