Took a five hour round trip, to turn on a breaker.
Got a call Tuesday from a Ranger Station at the far end of the Forest, that they had a backed up sewer line. Told them to call their maintenance crew, and if they can’t fix it, to call a plumber. I’ve been told that since we now have two maintenance crews, I’m supposed to quit doing field work, and focus on design and new construction.
The maintenance crew went and tried to get the drains working. They couldn’t get it with their small snake so they called out a plumber the next day (Wednesday).
They ran their snake out until it hit something solid and decided the line was collapsed.
They called me again yesterday, because the cost to dig up and replace the line, was going to be high enough to require a contract.
So, I drove two and a half hours to the site, and figured out that the blockage they had hit was the far side of a manhole, and that the manhole was so full, the sewage was coming out of the vent holes in the lid. So, I walked over to the controls for the sewage lift station.
No power. Walked over to the breaker panel, and the 200-amp main was off. The residents had decided they didn’t like the street lights, which are fed through that panel, and had thrown breakers until they went off except for the one labled “Leave On”, which feeds the street lights. So, they turned the 200-amp main of. Which killed the sewer lift station. And after just over a week everything backed up..
Turned the breaker on, checked that the lift station was running, and headed back home.