Hello guys,
I am new to the forum and have question about what option should I take in order to get faster and higher water volume into the building. Pardon my lack of knowledge about plumbing but I want to hear from more people before making the decision.
I own a flavored soda water company and have recently signed a lease to one of commercial properties in my area. The building is currently tapping water through 3/4" meter from the city but it has 1/2" copper running into the building. The building was built in 1960.
I have two different advises from the architect and the plumber. The architect wanted me to upgrade the water meter to 1.5" size but the plumber suggested just the opposite which was to keep the 3/4" meter but change the water line into the building and throughout to 1.5".
I have 2 x 1000 gallon tanks that I need to fill up rather quickly to make more soda water. Any advise is greatly appreciated.
Thanks,
Cindy
I am new to the forum and have question about what option should I take in order to get faster and higher water volume into the building. Pardon my lack of knowledge about plumbing but I want to hear from more people before making the decision.
I own a flavored soda water company and have recently signed a lease to one of commercial properties in my area. The building is currently tapping water through 3/4" meter from the city but it has 1/2" copper running into the building. The building was built in 1960.
I have two different advises from the architect and the plumber. The architect wanted me to upgrade the water meter to 1.5" size but the plumber suggested just the opposite which was to keep the 3/4" meter but change the water line into the building and throughout to 1.5".
I have 2 x 1000 gallon tanks that I need to fill up rather quickly to make more soda water. Any advise is greatly appreciated.
Thanks,
Cindy