Hello,
I am renovating my home by adding back-to-back bathrooms on the second floor. I have asked a plumber to do the plumbing. He came one afternoon and then he disappeared (after the first payment), and now I cannot find him . I am thinking to finish the job myself but I am worrying that he may have done something wrong. The following diagram shows the current plumbing:
1- He used "wet vent" for the 2 bathroom groups: and said toilets must be the last fixtures, but since "Lav1" will have its own vent , this would not be a code violation to have lav1's connection after Toilet2, is that correct?
2-For the "Horizontal to vertical" on one branch he used a regular 90-degree elbow, and for the other branch he used a long sweep elbow, Both branches are connected to 3" Wye in the vertical waste line. I asked him about the regular 90 degree and he said since it is used for horizontal to vertical, it is ok, I am wondering if that is correct for Wet venting/double toilet as well?
3- To make the toilets be the last fixtures, he has used a 7ft pipe for Toilet2, is that ok or any limit on its length?
Any help is highly appreciated, thanks.
I am renovating my home by adding back-to-back bathrooms on the second floor. I have asked a plumber to do the plumbing. He came one afternoon and then he disappeared (after the first payment), and now I cannot find him . I am thinking to finish the job myself but I am worrying that he may have done something wrong. The following diagram shows the current plumbing:
1- He used "wet vent" for the 2 bathroom groups: and said toilets must be the last fixtures, but since "Lav1" will have its own vent , this would not be a code violation to have lav1's connection after Toilet2, is that correct?
2-For the "Horizontal to vertical" on one branch he used a regular 90-degree elbow, and for the other branch he used a long sweep elbow, Both branches are connected to 3" Wye in the vertical waste line. I asked him about the regular 90 degree and he said since it is used for horizontal to vertical, it is ok, I am wondering if that is correct for Wet venting/double toilet as well?
3- To make the toilets be the last fixtures, he has used a 7ft pipe for Toilet2, is that ok or any limit on its length?
Any help is highly appreciated, thanks.
Attachments
Last edited: