GTBoston
New Member
Good morning all,
Working on a shower. I've attached pics to what was old steel pipe now removed, other than where there is a wye by the cast iron stack. That would involve opening holes in two celing rooms so will opt to just use a 2" thread PVC transition at the wye.
So the question is in the picture at the old shower drain there was a tee laid on its side that was use to go over about 10" used as the vent and then elbow up 90 and do into the attic and pic up the vent.
Can it still be vented in this manner?
I've also attached more pics of the plumbing
Working on a shower. I've attached pics to what was old steel pipe now removed, other than where there is a wye by the cast iron stack. That would involve opening holes in two celing rooms so will opt to just use a 2" thread PVC transition at the wye.
So the question is in the picture at the old shower drain there was a tee laid on its side that was use to go over about 10" used as the vent and then elbow up 90 and do into the attic and pic up the vent.
Can it still be vented in this manner?
I've also attached more pics of the plumbing