the tank is ~$1400. What kind of ball park $ should I expect to pay. The piping is the same. The egress isn't pefect,
1 flight down concrete basement stairs. Work space is adequate, not tight.
Should I expect $2500 or $4000?
And if this is not an acceptable post for here, I apologize.
1 flight down concrete basement stairs. Work space is adequate, not tight.
Should I expect $2500 or $4000?
And if this is not an acceptable post for here, I apologize.