One more time, please

Plumbing Forums

Help Support Plumbing Forums:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.

arky217

Member
Joined
Oct 5, 2012
Messages
8
Reaction score
0
Location
,
Thanks to everyone who commented on my previous posts about my proposed plumbing.
I have redrawn the plumbing and changed a number of things, so I thought it might be best
to ask for new comments in a new post.
Hopefully, I have everything close to kosher this time and would really appreciate your evaluation one more time.

A couple of comments to make the drawing a little clearer:

Sink #1 is the kitchen sink, #2 is the bathroom sink and, of course, the bath sink, commode and tub are in the same room;
they're shown like they are on the sketch just for clarity in how the piping is run.

All horizonal drain and vent runs have the standard 1/4" per foot slope.
The horizonal drain pipes tee into the verticals with a sanitary tee.
The vertical drain pipes tee into the 3" main with combo wye tees.

Increased the main vertical vent from 2" to 3" (It seems to me, however, that the 2" would work just as well, seeing as
how the toilet vent would also be getting venting from the tub and kitchen sink vents; would that not be so ?)

The kitchen sink horizon drain is now 36" instead of 66" and the vent goes 45 degrees for about 2 feet before going vertical within the wall.
(I understand that 45 degrees and steeper for vents is considered vertical)
The horizonal and 45 degree runs will be hidden within the sink cabinet base.
The vent does reduce to 1.5" through the top of the wall to clear a truss that is directly over the wall
(I know, I should have caught that before placing the wall), but since it is venting only the kitchen sink, hopefully 1.5" is sufficient.

Increase the final vent pipe to 4" to come closer to the sq." area of both 3" vents going into it.
(Not sure but if stayed 3", would it still have been sufficient ?)

From the toilet to the main stack, changed from a 90 degree elbow going into a combo tee wye, to a 45 degree elbow going
into a wye. Is that kosher, or should I have left it with a 90 into combo ? (Just seems like the 45 and wye is more of a straight shot)

The main cleanout is not actually under the house;
it will extend about 3 or 4 feet via a 22.5 degree elbow to the edge of the crawl space.

One last thing; I have included cleanouts as shown on the sinks and tub. Should I also add a cleanout just below the toilet
45 degree elbow or is that a short enough and vertical enough run not to need one ?


Thanks very much in advance for your comments,
Arky


5807-drain-vent.jpg
 
In Florida, the way you had it drawn the first time would have passed inspection and would have worked. Different codes, different areas.

The 1 1/2" vent for the kitchen sink will be fine. The main vent being 3" would have been sufficient.
 
Install the main cleanout below the vent where it exit the house
 
Install the main cleanout below the vent where it exit the house

??? Do you mean that I should have an additional main drain line cleanout via a wye where the main drain exits the edge of the crawlspace ?

Arky
 
Just a add on to John's answer, the clean out will also info you as to where the stoppage is ( on the house side or on the septic side). the location of the clean out as shown will not give you that info.
 
I would appreciate one last review of my plumbing layout.
Thank you for your previous comments.

Some changes are:

By repositioning the kitchen sink slightly, I was able to keep the trap arm within the max 60" length. And was able to keep the vent size 2" by locating it on the other
side of the wall in the pantry room (not ideal, but will not be too noticable behind shelving).

The bath sink, of course, is actually on the other side of the vertical 2", in the bathroom by the toilet.

I decided to go through the roof afterall with the main vent, right next to the ridge.

On the tub, I will put the trap within the floor joists; even though the crawlspace
is open, the insulation between the joists should keep it from freezing (I'm in
Arkansas, so it shouldn't be a problem).

The clean outs are marked C.O. and the one at the end of the main 3" line as well as the double clean out will be outside the perimeter of the crawlspace.

Do you see anything that might give me problems ?

Thanks,
Arky


5890-drain-vent.jpg
 