I've been speaking with a contractor about redoing our shower. I had him write up an estimate, which included moving the showerhead up by about a foot. In the estimate, he had a $350 charge for plumming parts and labor (not including the new showerhead and valve). I thought that was probably reasonable.
Then I decided I wanted to move the showerhead to the opposite wall. He gave me a rough estimate that it would be about an additional $1000 to move it. The entire shower is already going to be ripped apart, so I don't understand how it will cost this much? Is his price way out of line?
Then I decided I wanted to move the showerhead to the opposite wall. He gave me a rough estimate that it would be about an additional $1000 to move it. The entire shower is already going to be ripped apart, so I don't understand how it will cost this much? Is his price way out of line?