If the bend was 45 degrees it might be okay, but with a 90 degree bend the coil/snake on a 100' augur is under so much tension that no matter how you move it there is always tension pushing the cutter into the 2 mm ridge/seam where a straight drain meets the 90, so the augur can't be pulled back out the drain. Last time an augur went through a 90 it was stuck for 20 hours. It might be okay with a different cutter but the round/spiral cutter (looks almost like the tool for cutting holes for door locks / handles / for creating round holes in drywall) does not collapse when pulled back, and has teeth on both sides, so it catches).
A drain hole cover in the floor is more unsightly and unsettling than an access cover on a wall, so I want to move it to a wall stack, but I'm afraid I'll have the same problem I had outside, if not worse, since the coil would go thru multiple bends.
The flooring is good new vinyl plank. I need to leave access for a clear out.
Currently the flooring and drywall is all removed.
Would you move the clear-out to the wall?
A drain hole cover in the floor is more unsightly and unsettling than an access cover on a wall, so I want to move it to a wall stack, but I'm afraid I'll have the same problem I had outside, if not worse, since the coil would go thru multiple bends.
The flooring is good new vinyl plank. I need to leave access for a clear out.
Currently the flooring and drywall is all removed.
Would you move the clear-out to the wall?