How to replace a circa 1970 shower drain that is STUCK!

Plumbing Forums

Help Support Plumbing Forums:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.

LolaEliz

Member
Joined
Nov 12, 2024
Messages
7
Reaction score
0
Location
Allentown, PA
I posted this using google passwords, then opened this account. So I'm reposting it here, so I only have one account.

I am replacing the shower pan because it's cracked. I googled and it seems there are drains with a metal thing you twist to remove and drains with a black rubber thing you drill holes it to loosen it, then pull it out with needle nose pliers.

I tried drilling, but it appears the stuff that looks like putty (because it's so uneven) is metal. (the chards from drilling were silver / grey. (my dad liked to over-secure things. could be some kind of liquid nails.)

There doesn't appear to be any way to unscrew it (if it's a screw-off flange) without removing what looks like the grey / metal goop.

I also saw a googled post saying to cut through the pipe with a dremmel. I'm afraid the pipe will then be too short, so I'll wait for more advise, if that's the way to go.

I thought about cutting around the drain and removing the shower pan so I can look from underneath. The shower pan I believe is set in cement (crumbled cement, hence the crack), so I'm not sure what I'll get once that's attempted.

Here is a picture of the drain. Thank you in advance! (I sprayed WD-40, that's the liquid in the picture. And the rag is there, I took it out for the picture so you could see all the edges.)
 

Attachments

  • IMG_0074.jpg
    5.1 MB
The pipe needs to be cut, and a new drain and flange will be installed on the new pan. Slab or crawlspace?
 
Thank you! It's a second floor bathroom. Would it be right to cut it approx 1/8" down from the top of the pipe? I want there to be enough pipe for the new drain to connect too. Last question: The shower pan comes with a pvc drain. Wouldn't a brass one be better? I mean does plastic hold up over time?
IMG_0075.jpgo
 
Last edited:
If you are going to demo the pan and start over, cut a larger circle around the drain and get the pan out of there. That may give you access from the side to undo the nut holding it to the pan from the underneath
 
Thanks everyone for helping me! I got the shower pan out by drilling through the pipe. Now the pipe is a little shorter, and a new problem, the new pan doesn't naturally center over the drain, even though both are listed as 32" wide.

I lost 1/8" of pipe height, so it now sits 1/4" below the plywood sub floor. Looks like the subfloor rose a little at the seam where the beam is. It's a 50 year old shower. One good thing, everything was dry. Since the old pan has been out, some spots did form. There's nothing wet underneath, so I'm guessing it's coming out from the wood, from sweaty pipes over time.

(Ignore the faucet. I'm waiting for a moen valve. I decided not to put chinese junk behind the walls.)

Here's my next problem. (new picture, scroll down...)


IMG_0103.jpg

This picture is with the drain centered, but for it to be centered, I need to build out the long wall by 1.25" or (move the drain???)nThat seems like the extreme choice, unless the drain pipe being below the surface of the plywood is a problem.

I do have a friend who's gonna come check on my work. But any advise is really welcome. Thanks.

IMG_0108.jpg
IMG_0109.jpg
 
Fir the wall. cut out and replace the floor and address the drain when the floor is out. It seems as if you can pull that piece over to line up. Is it in the ground or in a ceiling space. Your probably going to need a internal pipe cutter and cut the pipe lower to add a coupling so it comes up high enough for the new shower drain. Its been a while since i have worked on a house, so i am sure you will get other suggestions that may be better for you.
 
Fir the wall. cut out and replace the floor and address the drain when the floor is out. It seems as if you can pull that piece over to line up. Is it in the ground or in a ceiling space. Your probably going to need a internal pipe cutter and cut the pipe lower to add a coupling so it comes up high enough for the new shower drain. Its been a while since i have worked on a house, so i am sure you will get other suggestions that may be better for you.
It's a second floor bathroom. Cut out the floor, wow, that's a big deal. The whole floor? Or a square from beam to beam, just to get to the drain? Do I use a jigsaw? Circular saw? Those are the 2 saws I have.

It would be so much easier to build out the wall, especially because the walls aren't super square. But if I need that drain pipe flush with the subfloor, then I will need to extend that pipe.
 