Randy0002
New Member
I recently discovered a crushed PVC line for our sump's discharge and I'm in the process of replacing the entire line using Schedule 40 PVC. After digging the line I discovered about 6 feet from the downspout/clean-out where it connects the sump's discharge line takes a 90 degree bend UP about 15". (This seems like a newer section of pipe) The discharge from the house is still above this point but I'm curious of this is normal or should be eliminated? If it should be eliminated how shallow can the pipe be to ensure proper grading?
Also, I live in Columbus, OH, should I add an ice guard to the discharge point?
I've attached photos to help show what I'm trying to explain. Thanks for your help!



Also, I live in Columbus, OH, should I add an ice guard to the discharge point?
I've attached photos to help show what I'm trying to explain. Thanks for your help!


