Hello,
I am trying to get a permit to install a sewage ejection system in my basement. I am doing it myself and can't understand a few of the question from the plan checker at the city. Please forgive my lack of basic knowledge on some of this.
First Correction
1.) Show fitting connections able to withstand subjected pressure clearly on plan. (PVC with no-hub bands not acceptable)
This is for the section after the pump. I understand that the pump jerks to a start and the fittings can crack and fail. So what does the code allow for pressure fittings? I was showing PVC "pressure fittings" but I guess that isn't flying.
2.) Show location of unions clearly on plan.
So, my beginners assumption was that unions are simply fittings that connect pipes. Obviously I am missing something. Do unions have a special function and need to be located in a certain place?
Thank you for any help!
Steve
I am trying to get a permit to install a sewage ejection system in my basement. I am doing it myself and can't understand a few of the question from the plan checker at the city. Please forgive my lack of basic knowledge on some of this.
First Correction
1.) Show fitting connections able to withstand subjected pressure clearly on plan. (PVC with no-hub bands not acceptable)
This is for the section after the pump. I understand that the pump jerks to a start and the fittings can crack and fail. So what does the code allow for pressure fittings? I was showing PVC "pressure fittings" but I guess that isn't flying.
2.) Show location of unions clearly on plan.
So, my beginners assumption was that unions are simply fittings that connect pipes. Obviously I am missing something. Do unions have a special function and need to be located in a certain place?
Thank you for any help!
Steve