Hi all, I am new to the forum and I had a quick question. I just finished doing the rough in for my basement bathroom and I realize I might have an issue with the toilet flange because the 3” street elbow is sitting too low in the concrete but high enough that a coupling would make it too high. The flange I have sits over 3” pipe so I’m not really sure how to extend it so I won’t have an issue later. The top of the elbow is about 1 1/2” lower than the concrete. I’ve included a picture to maybe help. Any help is greatly appreciated