kid
Member
I am just about done with demo, so I need to plan out my waste plumbing. I have a 4 inch main existing inline with where my two toilets will go. I will be tearing out all of the plumbing that runs to that line to rearrange the fixtures. I am trying to keep my stack in the same location, because it runs through a metal roof. I will expand it to a larger size.
I believe the attached layout will work, but please let me know if you see any issues.
Thanks in advance!
I believe the attached layout will work, but please let me know if you see any issues.
Thanks in advance!