I am finishing my basement. I am at the stage of building the bulk head around my HVAC runs. When the house was built, the plumber ran the existing PEX along side the HVAC runs. This adds a good foot and a half to my bulk head width. Any ideas as to how I could adjust the PEX to be vertical by adding some kind of vertical bracing to secure them to? Heres is a picture of what I am working with. Thanks!
Last edited: