Will my Waste line layout/design work? please help!

Plumbing Forums

Help Support Plumbing Forums:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.

franksr27

Member
Joined
Dec 19, 2015
Messages
5
Reaction score
0
Location
,
Hi Guys,

I am planning on adding an addition bath/bedroom. The concrete guys need to know where I want the trench for the plumbing do be dug. Attached is a picture of existing house and proposed addition. Could someone with experience please let me know if this layout is OK, or if there is a better way.?
The proposed bathroom is about 15-18 ft from the Existing waste line. I'm going to have a plumber do the plumbing but I don't have one yet and the concrete guys want to start cutting footings. this will be a slab foundation. Will be done to code. I feel like my layout would work and minimize problems but i don't trust myself with plumbing.
Thanks! -Rob

plumbing layout.jpg
 