blacmonn64
Member
Hello i'm new to this forum. Need some advice on my waste line repair job. First of all the lead pipe from the toilet to main stack had been leaking for a long time. Finally it got to the point where the floor around the toilet became weak. and I had to act. see first picture. The lead pic just pulled right out, no cutting all all.
second pic is the waste lines from the shower and sink.
After finding another leak by the shower overflow pipe I was like ok, time to remove the concrete and expose the pipes. About 3 inches of concrete, more deeper around the toilet.
There seem to be no more leaks. But the overflow tube from the shower has to go as well.
But its connected to the waste line from the shower. Did I mention that the house was built in 1903?
Anyway problem is what is the best way to fix the drain pipe from the toilet and also the best way to deal with the shower overflow pipe.?
Or if you see anything in the pics that might help or need more pics I can provide. thanks.
second pic is the waste lines from the shower and sink.
After finding another leak by the shower overflow pipe I was like ok, time to remove the concrete and expose the pipes. About 3 inches of concrete, more deeper around the toilet.
There seem to be no more leaks. But the overflow tube from the shower has to go as well.
But its connected to the waste line from the shower. Did I mention that the house was built in 1903?
Anyway problem is what is the best way to fix the drain pipe from the toilet and also the best way to deal with the shower overflow pipe.?
Or if you see anything in the pics that might help or need more pics I can provide. thanks.