Hi folks,
I'm installing my own plumbing in the house my wife and I are building
It's a single floor with a bonus over garage. The bonus has a bathroom. I ave completed routing and connecting all drains and vents. Now I want to test the system before I call for an inspection. I assumed I cap off all open pipes and then fill the entire system with water and look for leaks. I'm told here in TN that's how it's done. My question is what do I have to do-go into the attic and start filling the system by pouring water down the highest vent? This seems wrong or overkill. If any of you can point me in the correct direction...that would be great.
Thank so much,
Jim
I'm installing my own plumbing in the house my wife and I are building
It's a single floor with a bonus over garage. The bonus has a bathroom. I ave completed routing and connecting all drains and vents. Now I want to test the system before I call for an inspection. I assumed I cap off all open pipes and then fill the entire system with water and look for leaks. I'm told here in TN that's how it's done. My question is what do I have to do-go into the attic and start filling the system by pouring water down the highest vent? This seems wrong or overkill. If any of you can point me in the correct direction...that would be great.
Thank so much,
Jim