Hello, first post here.
To the point. While my gas tech guy is gone hunting (no cell) I'm trying to complete the install in my house. I have the data & correct material to install everything!
Question is,,,, while my vent pipe is totally vertical through the ceiling & roof,,,,, how is it I move the WH into place if the vent pipe is installed (can't move it up or down)?
Top of vent cap is 61.5" AFF (from spec sheet) and I'm guessing my vent pipe needs to be the same?
How does this work, I slide the WH in place and momentarily squash the vent cap?
Thanks, and if you have electrical questions I can probably help you on that.
To the point. While my gas tech guy is gone hunting (no cell) I'm trying to complete the install in my house. I have the data & correct material to install everything!
Question is,,,, while my vent pipe is totally vertical through the ceiling & roof,,,,, how is it I move the WH into place if the vent pipe is installed (can't move it up or down)?
Top of vent cap is 61.5" AFF (from spec sheet) and I'm guessing my vent pipe needs to be the same?
How does this work, I slide the WH in place and momentarily squash the vent cap?
Thanks, and if you have electrical questions I can probably help you on that.