I'm a design engineer
i hv a problem can't get a considered answer for it till now
when designing a sump pit will serve trenches and ground drain for basements
what drainage quantity to be considers for each trench or drain
and else
if this sum pit will sere a pump room , how can i take the tanks drain (wash line) and tank over flow in considered
I'm asking for the flow rate of the submersible and the pit size !!
i hv a problem can't get a considered answer for it till now
when designing a sump pit will serve trenches and ground drain for basements
what drainage quantity to be considers for each trench or drain
and else
if this sum pit will sere a pump room , how can i take the tanks drain (wash line) and tank over flow in considered
I'm asking for the flow rate of the submersible and the pit size !!