I am adding a new bathroom in basement and need help with the layout. I am in northern Virginia and the bathroom is below the main sewer line so I am installing a ejector pump.
Here is a quick lay out of how I was thinking of doing it.
-All WYE 's will be at a 45-90 degree up turn
-Vent will be at 45 degree turns, no 90's
-Ejector pump will have its own 2" vent to the roof
Questions:
1. For the floor drain dose it have to be 1.5" or 2" pipe?
2. Should the venting pipe be 1.5" or 2" pipe?
3. is the layout of how I vent the system ok?
4. Do I need another vent for washing machine? If I do can I tie it to Ejector vent?
Am I missing anything?
Thanks for the help
Here is a quick lay out of how I was thinking of doing it.
-All WYE 's will be at a 45-90 degree up turn
-Vent will be at 45 degree turns, no 90's
-Ejector pump will have its own 2" vent to the roof
Questions:
1. For the floor drain dose it have to be 1.5" or 2" pipe?
2. Should the venting pipe be 1.5" or 2" pipe?
3. is the layout of how I vent the system ok?
4. Do I need another vent for washing machine? If I do can I tie it to Ejector vent?
Am I missing anything?
Thanks for the help