I have a section of cast iron drain pipe that rotted out right under the middle of the house... im going to cut at each end of the house and replace with PVC, probably about 25 feet.
Wanted to install a clean out plug back at the sink, and possibly one right before it goes into the 4" sewer drain. I can do that with wye pieces right? Will use fernco couplers to join pvc to the cast iron. Here is a rough diagram, just wanted someone to check it out in case i missed something, or if there is an easier way to do it.
The #1 wye is the one i will for sure install, the #2 wye is optional because i dont know if it's really necessary (although i imagine the more clean out spots the better?).
http://i.imgur.com/ugOiTLz.png
Thanks!
p.s. i just realized i will probably need to tie the washer drain into this... so i will probably just use another wye to make that connection somewhere in the middle.
Wanted to install a clean out plug back at the sink, and possibly one right before it goes into the 4" sewer drain. I can do that with wye pieces right? Will use fernco couplers to join pvc to the cast iron. Here is a rough diagram, just wanted someone to check it out in case i missed something, or if there is an easier way to do it.
The #1 wye is the one i will for sure install, the #2 wye is optional because i dont know if it's really necessary (although i imagine the more clean out spots the better?).
http://i.imgur.com/ugOiTLz.png
Thanks!
p.s. i just realized i will probably need to tie the washer drain into this... so i will probably just use another wye to make that connection somewhere in the middle.