Active Member
Hi everyone. Looking for some info to help me get out of a pickle. I'm doing some hubbed cast iron waste line work but I'm having trouble with catching a seal on my joints. I've used oakum and lead several times in the past and never had a problem with it and have never had a joint not be good to go after the first time. I'm using 3 full strands of oakum on each joint and packing them in to allow for the 1 inch depth for the molten lead. Should I be typically using more oakum? Any other suggestions? I've always preferred this method over non-hub installation as it seems that lead joints outlast the pipe itself with old work but this ordeal is really a bummer. Well, thanks for reading.