Hey everyone, I am in the process of renovating my basement and im planning on making changes to the layout of the bathroom. The previous bathroom fixtures do not appear to be vented and i would like to make sure that the new layout is properly vented. Are there any problems that catch your attention with the drawing? Would a single 2 inch wet vent in this layout be sufficient? I will be tying into a 4 inch cast iron sewer line. Planning on 2" pvc for the lav/vent, 3" for the toilet and 2" for the shower.
Thanks

Thanks

