My concerns are that a clog occurs accessibility to the (cleanout pipe) is obstructed, and the face of the pipe opening is towards the foundation and below grade. So basically when 4 inches of gravel and 2 inches of asphalt is applied because it is on an angle either the pipe will be buried...